蚂蚁彩票平台 pk10 pk10开奖 pk10 pk10开奖 pk10
Product search

NHI Headlines

NHI "Cooperation 2" Tunnel Boring Machine Starts Tunneling

Published:2016-07-06

On April8th morning, along with a "rumble" roar, NHI "Cooperation2" Tunnel Boring Machine (TBM for short) started tunneling at the 17m underground construction site ofCulture West Road Station of metro line 10. Compared with other TBM, this TBMmade by NHI is more humane with reasonable spatial distribution and its cutter parametersare more suitable for Shenyangsoil. "Cooperation 2" TBM complete the installation of 20 ringsegments within 24 hours. It is equivalent of tunneling 24 meters, by an averageof tunneling one meter per hour.

友情链接:快3投注平台  福彩快三网上购买  快3权威投注  快3投注平台  福彩快三网上购买  快三在线投注平台  快三  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!