蚂蚁彩票平台 pk10 pk10开奖 pk10 pk10开奖 pk10
Product search

NHI Headlines

North extension line of Shenyang metro line 2 finished smoothly

Published:2016-04-11

Recently, the transfixion of the section 6of north extension line for Shenyang metro line 2 has been finished smoothly,which is manufactured by NHI. It adopts the Φ 6.28m Earth-pressure balanceTBM, and the total tunneling mileage is 1502m. (Wang Yao)


友情链接:快3平台  快三  快3权威投注  福彩快三网上购买  快3网  快三  快三  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!